Injection Molding in China: The DFM and RFQ Checklist Every Mechanical Engineer Needs Before Sending Files
Key Takeaways Most cost overruns in China injection molding do not start on the factory floor. They start at the RFQ stage — when a mechanical engineer sends a 3D file without draft angles, without a material grade, and without a gate location preference, and the factory builds a tool based on assumptions. By the […]










